Guys, I need to power down VNX 5300 unified completely.

Replace the component and power back up.

 

Please share the procedure to power down the full storage and then power back up once ths task is completed.

 

Thank You

 

 

 

2 Intern

 • 

141 Posts

January 10th, 2020 07:00

Just go to mydocs.emc.com

You can generate those documents there. Just select Model and type (Unified) and it will generate PDFs for you for the power off and power-on procedures.

Unisphere should have a Power Off option, then it can properly shut down everything.

Power on order is: DAEs, then DPE, then Data Movers, then control station(s). The documents will show you what status to wait for until the next step.

But what component do you need to replace that requires a complete shutdown?

June 24th, 2022 09:00

mydocs.emc.com does not exist

Moderator

 • 

7K Posts

June 24th, 2022 09:00

Hello JeffTurner9376,

The site has been changed to https://dell.to/39Mn1EM now.  Here is the new link. https://dell.to/3QLhBuc