Ir al contenido principal
  • Realice pedidos rápida y fácilmente.
  • Vea los pedidos y haga el seguimiento del estado del envío.
  • Cree una lista de sus productos y acceda a ella

Dell PowerEdge M1000e Enclosure Owner's Manual

General I/O Module Configuration Guidelines

  • If an I/O module is installed in Fabric B or Fabric C, at least one blade must have a matching mezzanine card installed to support data flow to that I/O module.
  • If a blade has an optional mezzanine card installed in a Fabric B or Fabric C card slot, at least one corresponding I/O module must be installed to support data flow to that fabric.
  • Modules may be installed in Fabrics B and C independently (you do not need to install modules in Fabric B before installing modules in the Fabric C slots).
  • Slots A1 and A2 only support Ethernet I/O modules. This fabric type is hardset to Ethernet for these slots and cannot support fibre channel, Infiniband, or other fabric type modules.
  • Fabrics A, B, and C can support Ethernet fabric-type modules.
  • To enable switch configuration prior to blade imaging, I/O modules are allowed to power-up before a blade is inserted in the enclosure.

Valore este contenido

Acertado
Útil
Fácil de entender
¿Le ha resultado útil este artículo?
0/3000 characters
  Proporcione valoraciones (1-5 estrellas).
  Proporcione valoraciones (1-5 estrellas).
  Proporcione valoraciones (1-5 estrellas).
  Seleccione si el artículo le ha resultado útil o no.
  Los comentarios no pueden contener caracteres especiales: <>()\