CPU and memory capacity
CPU and memory capacity requirements and general recommendations for VxRail 2-node cluster with VMware vSAN.
- When defining CPU and memory capacity, consider the minimum capacity required to satisfy the VM requirements when a failed state exists.
- In general, size a cluster to operate below 50 percent of the maximum CPU, considering the projected growth in consumption.
Data is not available for the Topic