Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products

Dell Storage Center SCv2000 and SCv2020 Storage System Deployment Guide

PDF

Prepare the Installation Environment

Make sure that the environment is ready for installing the Storage Center.

  • Rack Space — The rack must have enough space to accommodate the storage system chassis, expansion enclosures , and switches.
  • Power — Power must be available in the rack, and the power delivery system must meet the requirements of the Storage Center.
  • Connectivity — The rack must be wired for connectivity to the management network and any networks that carry front-end I/O from the Storage Center to servers.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\