Dell PowerVault ME5 Series Storage System Deployment Guide

Unpacking a 2U Enclosure

About this task

  • 2U enclosures are shipped with the controller modules or input/output modules (IOMs) installed.
  • Blank drive carrier modules must be installed in the unused drive slots.
  • For enclosures configured with FC or iSCSi controller modules that require SFP transceivers, see SFP transceiver for FC/iSCSI ports.

Steps

Unpack the 2U storage system and identify the items in your shipment.
NOTE The cables that are used with the enclosure are not shown in the following figure. The rail kit and accessories box is located below the 2U enclosure shipping box lid.
Figure 1. Unpacking the 2U12 and 2U24 enclosures
2U enclosure and rackmount kit
  1. Storage system enclosure
  2. Rackmount left rail (2U)
  3. Rackmount right rail (2U)
  4. Documentation
  5. Enclosure front-panel bezel option
  6. Rack mount ears

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\