Management IP address of the cluster to log in to
PowerStore Manager
PowerStore Manager user account credentials with administrator privileges
NOTE:Do not power off or reboot a node if the peer node is not operating normally. If the peer node is experiencing any major issues, associated alerts and events appear in
PowerStore Manager.
Also, to avoid service interruptions, ensure that there are sufficient and healthy paths from all connected hosts to the peer node.
NOTE:TLC flash drives retain data for up to 90 days while powered off. Data corruption may occur if the drives are powered off for more than 90 days or if they are stored in temperatures above 40° C (104° F).
NOTE: QLC flash drives retain data for up to 30 days while powered off. Data corruption may occur if the drives are powered off for more than 30 days or if they are stored in temperatures above 40° C (104° F).
Steps
Under
Hardware, select the appliance that includes the node you want to power off.
On the
Appliance Details page, select the
Components card.
On the
Components card, under
Internal View, select the node that you want to power off.
Under
More Actions, select
Power Down.
On the confirmation prompt, enter the service password, and then click
Power Down.
Next steps
To verify that the node has powered off, check the status of the LEDs in the rear of chassis. Other than the LEDs for the power supply unit, management port, and service port, all LEDs on the node must be OFF. The Unsafe to Remove LED on the active or peer node is ON.
Data is not available for the Topic
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please select whether the article was helpful or not.
Comments cannot contain these special characters: <>()\