- Notes, cautions, and warnings
- Additional Resources
- Install a new base enclosure and an optional expansion enclosure
- Installation power overview
- Install a new base enclosure
- Install a SAS expansion enclosure
- Summary of tasks for installing an expansion enclosure
- Verify shipping package contents
- Choose where to install the expansion enclosure
- Removing a filler panel
- Install the rails in the cabinet
- Install the enclosure on the rails
- Installing drives
- Installing the front bezel
- Cable the base enclosure to the expansion enclosure
- Connect SAS expansion enclosure power cables
- Add a SAS expansion enclosure
- Summary of tasks for adding an expansion enclosure
- Verify shipping package contents
- Choose where to install the expansion enclosure
- Removing a filler panel
- Install the rails in the cabinet
- Install the expansion enclosure on the rails
- Installing drives
- Installing the front bezel
- Connect SAS expansion enclosure power cables
- Cable the new SAS expansion enclosure
- Install an NVMe expansion enclosure
- Summary of tasks for installing an expansion enclosure
- Verify shipping package contents
- Choose where to install the expansion enclosure
- Removing a filler panel
- Installing the NVMe expansion enclosure rails
- Install the system in the cabinet
- Installing cable management arms
- Cable the base enclosure to the NVMe expansion enclosure
- Closing the cable management arms
- Testing the cable management arms
- Installing drives
- Installing the front bezel
- Add an NVMe expansion enclosure
- Summary of tasks for adding an expansion enclosure
- Verify shipping package contents
- Choose where to install the expansion enclosure
- Removing a filler panel
- Installing the NVMe expansion enclosure rails
- Install the system in the cabinet
- Installing cable management arms
- Cable the new NVMe expansion enclosure
- Closing the cable management arms
- Testing the cable management arms
- Attach the cables
- Installing drives
- Installing the front bezel
- Base enclosure service procedures
- Replace a faulted drive in the base enclosure
- Add a new drive to the base enclosure
- Replace an AC power supply
- Replace an embedded module
- Replace a 4-port card
- Replace a 2-port 100GbE card
- Replace an SFP
- Replace an I/O module
- Replace a fan module
- Replace a dual inline memory module (DIMM)
- Before you begin
- Identify a faulted DIMM from PowerStore Manager
- Power down the node
- Remove the node
- Remove the top cover from the node
- Remove the faulted dual inline memory module
- Install the dual inline memory module
- Install the top cover on the node
- Install the node
- Verify the operation of a replacement DIMM
- Return a faulted part
- Replace an internal M.2 boot module
- Before you begin
- Identify a faulted internal M.2 boot module from PowerStore Manager
- Power down the node
- Remove the node
- Remove the top cover from the node
- Remove the faulted internal M.2 boot module
- Install the internal M.2 boot module
- Install the top cover on the node
- Install the node
- Verify the operation of a replacement internal M.2 boot module
- Return a faulted part
- Replace an M.2 boot module adaptor
- Before you begin
- Identify a faulted M.2 boot module adaptor from PowerStore Manager
- Power down the node
- Remove the node
- Remove the top cover from the node
- Remove the faulted M.2 boot module adaptor
- Install the M.2 boot module adaptor
- Install the top cover on the node
- Install the node
- Verify the operation of a replacement M.2 boot module adaptor
- Return a faulted part
- Replace a node
- Before you begin
- Identify a faulted node from PowerStore Manager
- Power down the node
- Remove the node
- Remove the top cover from the node
- Transfer parts from the faulted node to the replacement node
- Install the top cover on the node
- Install the node
- Verify the operation of a replacement node
- Return a faulted part
- SAS expansion enclosure service procedures
- NVMe expansion enclosure service procedures
- Add a drive in an NVMe expansion enclosure
- Replace a faulted drive in an NVMe expansion enclosure
- Replace a power supply module in an NVMe expansion enclosure
- Replace a fan module in an NVMe expansion enclosure
- Replace a Clock Distribution Board in an NVMe expansion enclosure
- Replace an Access Module in an NVMe expansion enclosure
- Replace a data interface board in an NVMe expansion enclosure
- Replace a dual inline memory module (DIMM)
- Data-in-place upgrades
- Data-in-place upgrade overview
- Preconfigure the system with new hardware if required
- Start the data-in-place upgrade in PowerStore Manager
- Cancelling the upgrade
- Power off node A
- Remove source node A
- Move components from the source node to the target node
- Move the power supply
- Move the I/O modules
- Move the embedded module
- Remove the top cover from the node
- Move the M.2 boot module adaptor
- Move the internal battery backup module
- Install the top cover on the node
- Install the node
- Wait for node A to pass health checks
- Power off node B
- Remove source node B
- Move components from the source node to the target node
- Move the power supply
- Move the I/O modules
- Move the embedded module
- Remove the top cover from the node
- Move the M.2 boot module adaptor
- Move the internal battery backup module
- Install the top cover on the node
- Install the node
- Wait for node B to pass health checks
- Replace the black pull tag
- Update Global Asset Management records
- Safety precautions for handling replaceable units
- Power control procedures
- Power control procedure considerations
- Power control procedures preview
- Powering off procedures for PowerStore node
- Powering on procedures for PowerStore node
- Rebooting procedures for a PowerStore node
- Power off an appliance
- Power on an appliance
- Power off a cluster using PowerStore Manager
- Power on a cluster
- Transferring the internal battery backup module
- Data collection
- Support Notifications
- Add appliances to the cluster
- Remove appliances from the cluster
- Reinitialize the system