Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell PowerStore PowerStore T and Q Networking Guide for Storage Services

Steps to configure PowerStore T model with ToR switches without VLT

The following are the steps that are required to deploy PowerStore T model with two Top-or-Rack switches without a Virtual Link Trunking interconnect.

NOTE:This section assumes that initial deployment of the PowerStore T model appliance is complete and the Management switch and networks are successfully configured.

Specific code samples for the following steps for configuring PowerSwitches are available in Configuring Dell PowerSwitch Series for deployments with ToR switches.

  1. Establish a terminal session to the switch.
  2. Validate the switch version and licensing.
  3. Repeat steps 1 and 2 for each switch.
  4. Configure the general settings on the ToR switches.
  5. Configure the uplink ports on the ToR switches.
  6. If you have not done so already:
    1. Cable the base enclosure to the ToR switches
    2. Cable the ToR switches to the core uplinks
  7. Validate PowerSwitch Series configuration with ToR switches.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\