PowerStore T model deployment options
Once the
PowerStore T model hardware is installed, the Management switch and network must be configured as part of initial deployment.
Once the
PowerStore T model appliance has been deployed, optionally configure storage services.
Table 1. PowerStore deployment optionsPowerStore deployment options
Deployment option
|
Protocols and services
|
Switch requirements
|
Initial deployment
(Required)
|
Fibre Channel (FC) connectivity
|
At least one Management switch
For details see the
PowerStore Networking Guide for Initial Deployment
.
|
Storage services
(Optional)
|
Block-optimized which includes Fibre Channel (FC) connectivity with the option of adding:
- iSCSI host connectivity
- NVMe/TCP host connectivity
- Replication and Block Import
- Clustering
|
At least one management switch and two Top-of-Rack (ToR) switches
This document assumes the PowerStore appliance is deployed with the management switch configured.
|
Unified which includes Fibre Channel connectivity, Block-optimized options with the option of adding:
- Network Attached Storage
- File Mobility (required for File Replication and File Import)
|