Power on a cluster

About this task

Use the following procedure to power on a cluster:

Steps

  1. If nodes were removed, reseat the nodes into the relevant base enclosure chassis.
  2. If applicable, for each appliance in the cluster, ensure that expansion enclosures are also reseated into the cabinet.
  3. If applicable, for each appliance in the cluster, reconnect the power cables to each expansion enclosure in the following order:
    • Expansion enclosure 0
    • Expansion enclosure 1
    • Expansion enclosure 2

    The power status LEDs on each expansion enclosure turns on when the power cable is connected.

  4. For each appliance, reconnect the power cables to node A first, and then node B.
    The Node Power LED on each node turns on when the power cable is connected.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\