Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products

Dell PowerSwitch S5200F-ON Series Installation Guide July 2023

PDF

Optics installation

The S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switches have SFP+, SFP28, QSFP-DD, and QSFP28 optical ports.

For a list of supported optics, see the specification sheets at www.dell.com/support or contact your Dell Sales representative.

CAUTION:ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S5200F-ON Series switch and components.
WARNING:When working with optical fibers, follow all warning labels and always wear eye protection. Never look directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage.
  1. Position the optic to enter the port correctly.
    The optic has a key that prevents it from being inserted incorrectly.
  2. Insert the optic into the port until it gently snaps into place.
    NOTE:When you cable the ports, be sure not to interfere with the airflow from the small vent holes above and below the ports.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\