Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

S4100–ON Series S4128F-ON, S4148F-ON, and S4148FE Installation Guide November 2017

PDF

Two-post flush-mount installation

  • NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
  1. For this configuration, remove the latch castings from the front side of each ReadyRails assembly, item 1. To remove the two screws from each front flange ear on the switch side of the rail and remove each latch casting, use a Torx screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back flange castings.
    Figure 1. Two-post flush-mount installationIllustration of the two-post center-mount threaded round-hole installation.
  2. Attach one rail to the front post flange with two user-supplied screws, item 2.
  3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws, see item 3.
  4. Repeat this procedure for the second rail.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\