Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

S4100–ON Series S4128F-ON, S4148F-ON, and S4148FE Installation Guide November 2017

PDF

Two-post center-mount installation

  • NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
  1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws, item 1.
    Figure 1. Two-post center-mount installationIllustration of a two-post center-mount threaded round-hole installation.
  2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3. 
  3. Repeat this procedure for the second rail.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\