Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

S4100–ON Series S4128F-ON, S4148F-ON, and S4148FE Installation Guide November 2017

PDF

S4100-ON Series installation

You can mount the switch in the 1U front-rack two-post, flush or center configuration, or a four-post configuration. The following is an example of a front-rack configuration:

For the 1U two-post configurations, slide the switch into the rails in the same manner as the four-post configurations.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\