Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

S4100–ON Series S4128F-ON, S4148F-ON, and S4148FE Installation Guide November 2017

PDF

Four-post threaded installation

  • NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
  1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx driver. Retain the latch castings for future rack requirements.
    Figure 1. Four-post threaded installationIllustration of a four-post threaded round-hole installation.
  2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\