Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

PowerScale OneFS Upgrade Planning and Process Guide

Roll back an upgrade using the CLI

Rolling back stops an upgrade and returns the cluster to the previous committed version of OneFS.

NOTE:The rollback process must restart all the upgraded nodes simultaneously. This will temporarily disrupt cluster services and data availability.

Command-Line Interface instructions:

  1. Open a secure shell (SSH) connection on the lowest-numbered node in the cluster and log in with the root account.
  2. To roll back the upgrade, run the following command:
    isi upgrade cluster rollback 

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\