Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

PowerScale OneFS 9.5.0.0 CLI Administration Guide

Override the retention period for all files in a SmartLock directory

You can override the retention period for files in a SmartLock directory. All files committed to a WORM state within the directory will remain in a WORM state until after the specified day.

If files are committed to a WORM state after the retention period is overridden, the override date functions as a minimum retention date. All files committed to a WORM state do not expire until at least the given day, regardless of user specifications.
  1. Open a secure shell (SSH) connection to any node in the PowerScale cluster and log in.
  2. Override the retention period expiration date for all WORM committed files in a SmartLock directory by running the isi worm modify command.
    For example, the following command overrides the retention period expiration date of /ifs/data/SmartLock/directory1 to June 1, 2024:
    isi worm domains modify /ifs/data/SmartLock/directory1 \
    --override-date 2024-06-01

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\