Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products

Integrated Dell Remote Access Controller 9 User's Guide

Performing and checking system/ component configuration status

NOTE:Ensure that you give few seconds of interval while using the command getremoteservicesstatus with a timeout of 5 minutes.
  1. Check for firmware inventory (follow the procedure mentioned above).
  2. To avoid possible failures later, ensure that the required component is present in the system.
  3. After initial checks, use getremoteservicesstatus method/URI/command to check if LC status is ready. Based on the requirement for some components like storage and network, other status may need to be checked, for instance, whether system is Out of POST and Real Time (RT) status.
  4. Once LC is ready, use the system/ component configurations and create the job.
  5. Create reboot job or reboot the host if the configuration requires a host reboot. Specific configuration setting might require a cold reboot.
  6. The caller must check for job status to be completed - Success/ Failure. View LifeCycle Log events, job queue status and check config results for more details on the failures.
  7. Only after Collect System Inventory On Restart (CSIOR) in host if required is completed successfully, the job marks as completed if not failed. This is applicable if host reboot is required.
  8. Once the job is completed, wait for 30 s, and then use getremoteservicesstatus method/URI/command to check if LC status is ready, with other required status and then read the expected values.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\