Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell PowerProtect DD Management Center (DDMC) 7.9 Installation and Administration Guide

Assigning and unassigning measurement schedules for physical capacity

You can assign and unassign measurement schedules for physical capacity of MTrees, Tenant Units, or Tenants, using the Assign/Unassign Schedules dialog. Assigning a schedule to a Tenant will measure that Tenant on all DD systems used by the Tenant.

Steps

  1. Select all or multiple MTrees, a single MTree, a Tenant Unit, or a Tenant for which you want to assign or unassign schedules.
  2. Select Capacity > MTrees > Physical Capacity Measurement menu > Assign/Unassign Schedules.
    In Classic View, select Capacity > Management > MTree tab > Physical Capacity Measurement menu > Assign/Unassign Schedules
  3. In the Assign/Unassign Schedules to entity dialog, you can move schedules from the Available Schedules list to the Assigned Schedules list, and vice versa, using the arrows. The double arrows (>> and <<) move everything. The single arrows (> and <) move only the selected schedule.
  4. Select Save or Cancel.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\