Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell PowerProtect DD Management Center (DDMC) 7.9 Installation and Administration Guide

Generating SMT reports

An SMT report can be generated after the last step of the Create Report wizard or by selecting a report template listed in the Template name table and selecting Run Report.

About this task

Schedules may be consolidated on multiple Data Domain and PowerProtect systems, as follows:
  • If two or more schedules have the same name, type, and schedule (for example, "every Monday at 7 AM"), DDMC displays one schedule that is configured on different systems.
  • If two schedules have the same name, but different types and/or different scheduled times, DDMC displays two schedules.
  • If a schedule is Disabled on one system, but Enabled on another, DDMC displays one schedule.

Steps

  1. Select Reports > Management.
  2. Select a report template from the list.
  3. Select Run Report.

Results

A report (named by concatenating the datestamp to the template title) is created and opened as a PDF file in the browser, except for the Tenant Usage report, which is generated as an Excel file.

The report generation information is listed in the Report History table, where it can be viewed, renamed, or deleted.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\