Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Data Domain DD9800 System Installation and Storage Expansion Guide

PDF

Unpack the system

  1. Remove the accessories and rail mount kit from the shipping packages.
  2. Remove the controller and the bezels from the shipping packages.
    NOTE For field installations, the controller has temporary handles pre-fitted at the factory to help in removal of the system from the box and for placing it in a rack. While the controller is being placed in a rack, the handles attached to the chassis can be removed by loosening the thumbscrew on each handle. The handles must be saved for future use.
    CAUTION Data Domain systems are heavy. Always use two people or a mechanical lift to move a system. The chassis displays warning labels.
    Figure 1. Warning about lifting the system
  3. Remove expansion shelves and their bezels from the shipping packages.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\