- Notes, cautions, and warnings
- Introduction and Preparation
- Install the System in the Rack
- Install the Disk Shelves in the Rack
- Connect Cables and Power On
- Connecting the expansion shelves and the controllers
- ES30 cable information
- Connecting multiple ES30 shelves to the DD9800 system
- DS60 cable information
- Connecting multiple DS60 shelves to the DD9800 system
- Connecting the HA interconnect
- Connect data cables on both nodes
- Power on the systems
- Install the bezel
- Configure System for Use
- Add Storage Capacity