NOTE Power on all expansion shelves first before powering on the controller.
Connect power cables to each expansion shelf receptacle and attach the retention clips.
Provide power to power on each expansion shelf. The shelves power on when plugged in. Ensure that each shelf power cable is connected to a different power source.
NOTE Wait approximately 3 minutes after all expansion shelves are powered on before powering on the controller.
Provide power to power on the controller. The system powers on when plugged in. The first boot may take several minutes to complete.
NOTE Connect systems to redundant AC power sources. Redundant power sources allow one AC source to fail or be serviced without impacting system operation. PSU0 should be attached to one AC source. PSU1 should be attached to the other AC source.
Connect power cables to each receptacle and attach the retention clips.
Ensure that each power supply is connected to a different power source.
Data is not available for the Topic
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please select whether the article was helpful or not.
Comments cannot contain these special characters: <>()\