- Notes, cautions, and warnings
- Introduction and Preparation
- Install the System in the Rack
- Install the Disk Shelves in the Rack
- Connect Cables and Power On
- Configure System for Use
- Add Storage Capacity
The cabling diagrams in this section show maximum configurations. Not all systems will have all the disk shelves shown in the diagrams.
Add shelf-to-shelf cables between shelves in a loop and to the controller as shown in the diagrams.
For HA pairs, the primary and standby nodes use different cables to connect to ES30 shelves. The primary node uses cables for ES30 host ports (), and the standby node uses cables for ES30 expansion ports ().