Data Domain DD9300 System Installation and Storage Expansion Guide

PDF

Connecting DS60 shelves

The cabling diagrams in this section show maximum configurations. Not all systems will have all the disk shelves shown in the diagrams.

Add shelf-to-shelf cables between shelves in a loop and to the controller as shown in the diagrams.

  1. The recommended cabling for HA uses a maximum of three loops.
  2. There are no specific placement or cabling requirements for SSD shelves. These shelves can be installed and cabled the same way as standard ES30 shelves.
  3. The SSD shelf counts towards the total number of shelves connected to the system.
  4. Data Domain recommends installing the SSD shelf in the V1.1 positon, but if that is not possible, the shelf can be placed in a different location in the rack so long as cables of sufficient length are available.
    NOTE V1.1 is recommended for better performance because this will the 1st hop where data will be written. If the SSD shelf is connected to the last enclosure in a chain, then each read/write request has to go through many hops, which introduces latency issues when compared to when the SSD shelf is on the 1st shelf of a chain.
  5. Use the cable management assembly to support and organize all cables.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\