Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Data Domain DD6300 System Installation and Storage Expansion Guide

PDF

Install the system into a rack

About this task

CAUTION Data Domain systems are heavy. Always use two people or a mechanical lift to move a system.
Figure 1. Warning about lifting the system
CAUTION
  • The system controller should be installed in the pre-defined location for the system controller in the rack to comply with Data Domain rack mounting guidelines.
  • Do not apply AC power to the system controller until all expansion shelves and cables are installed.
  • Ensure the PSNT label, which is in a slot just beneath the power supply on the rear of the chassis is not damaged or snagged during the installation of the system into the rack.

Steps

  1. From the front of the rack, lift the chassis to install the system in the rack in the correct location.
  2. Slide the unit onto the rails and push it fully into the cabinet until the mounting holes on the unit are flush with the NEMA channel.
    Sliding the unit onto the rails
  3. Secure the unit to the NEMA channel and rails using four screws, two on each side.
    Securing the unit to to the NEMA channel using two screws on each side, four total
  4. Check the PSNT label in the slot just beneath the power supply at the rear of the chassis.
    Figure 2. Service tag (components removed for clarity)
    • 1. Service tag bracket
    • 2. Locking tab
    • 3. Service tag

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\