Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Create and access a list of your products

Dell PowerFlex Rack with PowerFlex 3.x Administration Guide

PDF

Power off the MDM cluster

Use this procedure to power off the MDM cluster.

Steps

  1. To verify that the MDM cluster is healthy, type scli --query_cluster --tech from the primary MDM.
  2. Depending on the PowerFlex node on which the MDM is residing, perform either of the following:
    If the MDM is residing on...Do this...
    PowerFlex storage-only nodes Shut down the PowerFlex storage-only nodes in the following order:
    1. Secondary MDM
    2. Tiebreaker
    3. Primary MDM
    PowerFlex hyperconverged nodes
    1. Shut down the SVMs in the following order:
      1. Secondary MDM
      2. Tiebreaker
      3. Primary MDM
    2. Place the host in maintenance mode
    3. Power off the VMware ESXi node

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\