Prerequisites to setup multisite fabric interconnect
Ensure that the following requirements are met before configuring multisite fabric interconnect:
Verify the physical connections on the fabric interconnect. SFS supports the fabric interconnects links (direct or external) between leaf switches and spine switches.
Ensure that the domain IDs of the fabrics are different.
Ensure that the ASNs of the switches are different.
Launch the SFS GUI of both the fabrics (Site 1 and Site 2) to collect the following information that you have to enter during the fabric interconnect setup:
Domain IDs of the Site 1 and Site 2 fabrics—From SFS GUI, click
Global Settings >
Fabric Settings to view the domain ID.
BGP ASN numbers of the switches deployed in the Site 1 and Site 2 fabrics—From SFS GUI, click
Global Settings >
Fabric Settings to view the ASN details.
Loopback address of the switches deployed in the Site 1 and Site 2 fabrics—From SFS GUI, click
Global Settings >
Fabric Interconnect Details to view the loopback address of each switch in the fabric.
Data is not available for the Topic
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please select whether the article was helpful or not.
Comments cannot contain these special characters: <>()\