From deployment to management, Principled Technologies put Dell PowerEdge with OpenManage to the test versus HPE Synergy with OneView
Like a bullet train, the term “fast” implies high speed and performance. The term also applies to how quickly a task can be accomplished – helping you stay ahead of your deadlines to meet your goals.
The metrics that contribute to whether or not something is ”fast” can vary according to the end results. In business, it is all about expanding in the context of a competitive landscape. Delivering results and improving time-to-market applies to services and products. The engine delivering these metrics for the business is IT.
Getting to “fast” IT often means expanding in order to serve existing and new business needs. For IT, speed is critical when buying new products to run business workloads. “Fast” also means managing the ever-growing infrastructure and data center. And now, IT has to get the most out of each resource for the next job, the next application, the next need, and so on. Lastly, ”fast” also helps you integrate new equipment into your specific environment without downtime, hassles, or losing time configuring and waiting.
The end result is “fast”-er time-to-business.
Principled Technologies performed a detailed look at “fast” in a few virtual environments using Dell PowerEdge servers, Dell Integrations and OpenManage suites. Testing with specific and popular environments was key, so Principled Technologies chose to test with Microsoft System Center and VMware vCenter.
These environments are deployed globally across thousands of customers. While hardware can be easily deployed and placed into the infrastructure, without a complete solution that allows IT to configure, deploy and manage within those environments, you could easily waste significant time and effort trying to make it all work – and the premise of “fast” is lost.
Getting to “fast” in your environments
Principled Technologies put Dell PowerEdge with OpenManage to the test against HPE Synergy with OneView, and showcased that ”fast” can profoundly impact your time-to-business results: Up to 97% faster and 20 fewer steps than HPE deploying three Microsoft Windows servers with Dell PowerEdge and OpenManage Essentials!
When they tested with Microsoft System Center[1], the results were still impressive:
- Up to 87% faster and 24 fewer steps than HPE deploying multiple servers with the Dell PowerEdge FX2 with OpenManage Integration for Microsoft System Center Configuration Manager
- Up to 46% faster than HPE deploying a single host with Dell PowerEdge FX2 with OpenManage Integration for Microsoft System Center Virtual Machine Manager
Leveraging the Dell OpenManage Integration for Microsoft System Center enabled faster deployments for the business compared to a solution using HPE Synergy with OneView. Furthermore, no additional hardware such as a dedicated PXE server or deployment network was required, resulting in no lost time or additional expense. OpenManage integrates readily with Microsoft System Center Virtual Machine Manager to quickly expand a virtual infrastructure.
Testing also revealed that configuring, deploying and maintaining Microsoft Windows servers with Dell OpenManage Essentials made standard operations faster[2]:
- OpenManage Essentials saved over 22 minutes (up to 91% less time) to deploy a single Windows server
- Dell PowerEdge FX2 with OpenManage Essentials can update firmware for three Windows Servers up to 27% faster than HPE Synergy solution with OneView
- 6 fewer steps than HPE updating firmware for three Windows Servers
Similarly, OpenManage Integrations for VMware vCenter allows IT admins to manage servers directly from within vCenter. Tasks like creating profiles, templates to deploy and firmware updates can easily be done without leaving vCenter. Doing similar tasks with HPE Synergy requires users to exit from the vCenter console. This raises the risk of more user errors with extra steps and time to complete. With vCenter integration, typical tasks take less than 10 steps and under four minutes. Savings like these could shrink time and effort for IT admins compared to using HPE OneView for VMware vCenter with HPE Synergy.
Along with Dell Integrations, IT can scale management further with the Dell OpenManage Enterprise suite. The powerful suite helps you simplify, automate and unify management tasks, across a data center with up to thousands of PowerEdge servers.
Further, setting up the Dell PowerEdge FX with 14th gen FC640 blades for this environment saved up to 36% on costs including deployment, or a savings of more than $140,000.
With time and cost savings, IT can be “fast” and get much more done in Microsoft and VMware environments using Dell FX2 servers, Integrations and OpenManage.
The result is “fast” can really work to a company’s advantage, and get you the results you want.
“Fast” time-to-business can be an overused term and hard to scope in terms of ROI, but ‘fast” can be achieved. Principled Technologies results show how systems, solutions, and suites that work all together can easily fit into your environment. And this combo can yield great gains. IT gets better control of management. Doing so lets IT quickly turn idle resources and newly installed equipment into working and managed workhorses for your business
While your IT and infrastructure may not be bullet-train fast, working with the right systems and solutions can enable your business to get “fast-er” results.
To learn more, visit Dell.com/Choose-PowerEdge
[1] Principled Technologies (PT) report commissioned by Dell, “Get flexible, feature-rich datacenter management at a lower cost” March 2018, comparing Dell FX2 with OpenManage vs. HPE Synergy with OneView.
[2] Ibid