Brocade 48K Merge into Existing Fabrics

Hi All,

We are trying to re-deploy the switches, these are shipped from a different datacenter, and now we are targeting them bring into (merge) production/existing fabrics this weekend. As part of the process, we requested the Network connections, at this point of time i have remote login (serial connection) via Cyclade.

I need this connection only one time to set up ippaddrset. Once that is done, i can telnet/ssh and then configure the switch upfront, by configupload from existing switch and modify parameters (like unique domain id) and then configdownload to the switch to be merged. In this process, can you please give high level steps to be executed?

i have already cleared the zone configurations.

High level steps to merge a brocade 48k into production fabrics.

Thanks in Advance

141 Posts

December 12th, 2017 07:00

Hi there,

In our efforts to clean up the forum, we came across your question / statement.

If the question / statement is still valid, not expired and you need an update please reach out again and we try to get it answered.

As for now we will set it to “answered.”

Regards,

Jim

38 Posts

March 5th, 2012 18:00

Hi,

You may follow the below sequence

- connect to the switch through telnet

- disable the switch

- configure the domain ID and then switch enable

(the above 2 steps are very critical because in case u have a duplicate domain ID elsewhere on the fabric, it may spell disaster)

- connect the switch into the fabric and go ahead with zone configs

22 Posts

March 6th, 2012 05:00

Hi, thanks, but what other parameters need to be modified in configuration script? like any boot variables to be removed etc etc?